New Pool Installations

The installation of a new pool is a tedious process. Once the homeowner decides on the type of pool they want and the location of the pool, the project begins.

  • Step one: Homeowner selects pool type and location
  • Step two: Contracts are signed and sub-contractors are selected
  • Step three: Permit applications are submitted
  • Step four: Permits are granted
  • Step five: The pool excavation begins (the dig)
  • Step six: Pool construction begins:
                    • Pool walls are constructed
                    • Pool collar is poured
                    • Pool plumbing is installed
                    • Pool equipment is installed and connected to plumbing
  • Step seven: Required inspections take place, and upon approval, construction continues.
  • Step eight: Pool floor is constructed
  • Step nine: Pool liner is installed
  • Step ten: Water is added
  • Step eleven: Pool runs!
  • Step twelve: The final step is the installation of pool decking around the pool and the waterfall (when selected). 

The length of time required to construct a new pool varies based on the type of pool and the completion of inspections. In most cases, the delays are caused by the inspection process.

 

K & M Pools

Marker-961265 Englishtown Rd., Old Bridge, NJ
Phone Filled-100 Office: 732.251.7600
Print-96 Fax: 732.251.7900
Message-96 Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

NJ Contractor: 13VH08897300

accreditation